The specialist mix used was P1200 foam concrete, ideal for pipeline decommissioning and void infill due to its flowability, strength profile, and ultra-lightweight characteristics.
128m³ placed over two consecutive days using continuous pumping
Dry density target: 1000kg/m³
Wet density target: 1050kg/m3
300kg of Cem I per m³
900kg of GGBS (Ground Granulated Blast Furnace Slag) per m³
720litres of water per m3